I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (2024)

About 6:05 p.m. central daylight time on Wednesday, August 1, 07, the eight-lane, 1,907-foot-long I-35W Highway Bridge over the Mississippi River in Minneapolis, Minnesota, experienced a catastrophic failure in the main span of the deck truss. As a result, 1,000 feet of the deck truss collapsed, with about 456 feet of the main span falling 108 feet into the 15-foot-deep river. A total of 111 vehicles were on the portion of the bridge that collapsed. Of these, 17 were recovered from the water. As a result of the bridge collapse, 13 people died, and 145 people were injured. On the day of the collapse, roadway work was underway on the I-35W Bridge, and four of the eight travel lanes (two outside lanes northbound and two inside lanes southbound) were closed to traffic. In the early afternoon, construction equipment and construction aggregates (sand and gravel for making concrete) were delivered and positioned in the two closed inside southbound lanes. The equipment and aggregates, which were being staged for a concrete pour of the southbound lanes that was to begin about 7:00 p.m., were positioned toward the south end of the center section of the deck truss portion of the bridge and were in place by about 2:30 p.m. About 6:05 p.m., a motion-activated surveillance video camera at the Lower St. Anthony Falls Lock and Dam, just west of the I-35W Bridge, recorded a portion of the collapse sequence. The video showed the bridge center span separating from the rest of the bridge and falling into the river." 2
Martin P. Burke Jr., PE

This is a premium article available exclusively for our subscribers.

If you are already a subscriber, please Login

If not, subscribe now and get access to well researched articles & reports on infrastructure construction, equipment & machinery, innovations & technology, project reports, case studies, and more. All this by simply paying just ₹200/- for a month of complete portal access, or a discounted rate of ₹1000/- for a full year of access.

Subscribe for a Month @₹200/-

Subscribe for a Year @₹1000/-

NBM&CW September 2011

No comments yet, Be the first one to comment on this.

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (3)

15 Bridges Collapse in 2 Months: Bihar’s Infrastructure Crisis Unfolds

Bihar is witnessing an alarming series of bridges collapsing, highlighting the vulnerability of both new and existing infrastructure in the state, and raising concerns about public safety and the overall effectiveness of its infrastructure

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (4)

Cengrs Geotechnica: Preventing Bridge Collapse Through Foundation Testing

The recent bridge collapses in Bihar have ignited widespread concern over the safety and reliability of our critical infrastructure. As a specialist in Geotechnical Engineering, I firmly believe that thorough geotechnical investigations

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (5)

Chaitanya Projects Consultancy: Addressing Bridge Failures

The recent bridge collapses in Bihar have cast a spotlight on the pressing issue of infrastructure safety. These tragic events underscore the need for a thorough examination of the reasons behind such failures and the implementation

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (7)

MASIN: Unraveling the Causes of Bridge Collapses in India

MASIN delves into the critical factors contributing to bridge collapses in India, including design flaws, construction errors, and maintenance issues.

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (8)

Constructing Bridges Right: Risk Management for Large-Scale Projects

Constructing large bridge projects entails managing multifaceted risks, spanning from product quality to project management. Mitigation strategies involve thorough planning, stakeholder engagement, regulatory compliance, and proactive

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (9)

Impact of Baltimore Bridge Collapse on Machinery Supply in the US

Alexander Jones, Research Analyst, delves into the impact of Baltimore Bridge collapse on the agricultural and construction machinery supply chain in the United States. The tragic incident in which a container ship collided with a support

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (11)

Comparative Analysis: Japanese vs Indian Bridge Fabrication Techniques

This technical paper delves into a comparative analysis of steel bridge fabrication methods employed in Japan and the traditional practices in India, with a specific focus on the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project's adaptation

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (12)

Remotely Piloted Aerial Vehicle (RPAV) Based Bridge Monitoring

Dr. Naveet Kaur, Senior Scientist, Bridge Engineering & Structures Division, CSIR-CRRI, New Delhi, shares information on the various types of applications of RPAV technology in BHM, including visual inspection, non-destructive testing, and structural health

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (13)

Prestressing Concepts, Systems & Technologies in Bridges

Prestressing works as an active force in the structure, opposite to applied tensions. There are several types of prestressing such as Internal Prestressing, External Prestressing, Bonded Prestressing, Unbonded Prestressing, etc. Pre-tensioning and Post-tensioning

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (15)

Structural Integrity Assessment of Submerged Bridges Using Robotic Inspection and Scour Survey

In a developing country like India, roads, rails and bridges are amongst the most important infrastructure assets that connect every corner of the country. Roads and bridges tend to undergo wear and tear with aging. When they get submerged

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (16)

Structural Retrofitting of Chitpore Bridge

The Chitpore Bridge was repaired using anti-corrosive treatment, rebuilding of concrete section with micro concrete and polymer, followed with strengthening by using SRM C-wraps and SRM C- Laminates of carbon fiber. After successful completion

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (17)

Design Concept of Iconic Pedestrian Bridges - Atal, Sambhaji, and Deccan

Theme-based concepts of structural forms and designs of bridges are developed through collaborative efforts of the architects and engineers to maintain their aesthetics and structural efficiency. Any bridge or infrastructure is designed for

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (19)

Construction of Balason Bridge in Darjeeling District @ West Bengal - An Engineering Feat

Situated amidst picturesque surroundings, Balason Bridge is located about 50 km from Siliguri Town, 17 km from Mirik Town and 80 km from Darjeeling Town. The Extension of Balason Bridge @ Dudhia is located 25 km from Siliguri Town in the state of West

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (20)

Dextra supplies Mechanical Rebar Couplers and Post-Tensioning Bar Systems to new Zuari Bridge in Goa

An 8-lane cable-stayed bridge being constructed over the river Zuari in South Goa, has taken engineering to new heights. This is the second longest and widest cable-stayed bridge in India; it will serve Expressway NH-66 that runs between Panaji

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (21)

Construction Industry - Progressing Towards A 'Digital' Future

The Indian construction and engineering industry is poised for significant growth with a projected expansion of 6.6% in real terms. As part of the ambitious Pradhan Mantri Gati Shakti Master Plan, worth $1.3 trillion, India’s infrastructure development

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (23)

NHAI invites bids ₹244-cr six-lane flyover & two-lane ROB in Odisha

NHAI invites bids for six-lane flyover and two-lane ROB in Odisha with an investment of ₹244.32 crore. The Ainthapali junction project on NH-53 (Old NH-6) in Sambalpur involves the rehabilitation, upgradation, and augmentation

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (24)

Synergising Aatmanirbhar Bharat and Operational Preparedness: Launch of Indigenous Modular Bridge in Sikkim

Enhanced operational preparedness along the borders and the need to be self-reliant are two major aspects that have seen a substantial impetus over the last few years. The Border Roads Organisation (BRO) has been a key contributor to the infrastructure

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (25)

Architectural System for Arch Bridges

Dextra India’s architectural systems mainly include Tension Rods and Compression Struts, which creates functionally effective and aesthetically pleasing structures. Featuring a wide range of sizes and accessories in various steel grades and in both

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (27)

Load Testing of Various Types of Bridge Superstructures

Er. Vivek Abhyankar describes the steps and aspects of load testing of various types of superstructures, along with some cautionary measures and points to ponder upon by the designers, site engineers, and testing agencies. The information provided will be

Read more ...

I-35W Mississippi River Bridge Collapse and the G/P Phenomenon (2024)

References

Top Articles
Latest Posts
Article information

Author: Pres. Lawanda Wiegand

Last Updated:

Views: 6487

Rating: 4 / 5 (71 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Pres. Lawanda Wiegand

Birthday: 1993-01-10

Address: Suite 391 6963 Ullrich Shore, Bellefort, WI 01350-7893

Phone: +6806610432415

Job: Dynamic Manufacturing Assistant

Hobby: amateur radio, Taekwondo, Wood carving, Parkour, Skateboarding, Running, Rafting

Introduction: My name is Pres. Lawanda Wiegand, I am a inquisitive, helpful, glamorous, cheerful, open, clever, innocent person who loves writing and wants to share my knowledge and understanding with you.